Copeland Brothers Electrical Contractors Projects


Project-1

OSTI Building


10 Month Project
Install 300 KW Natural Gas Generator
Temporary Power to Trailer
Above and Underground Feeder Conduits
Switchgear
Light Fixtures
Electrical Demo in Mezzanine Area
Feeder Cables

Electrical Panel Tie In and Rough In
Communication Rough In with Cable Trays and Riser Conduit
Electrical for Appliances, Plug and Switch Trim Outs
Cards Readers, Electric Locks, Balanced Magnetic Switches and Motion Detectors
Transformer
Panel Schedules
Telecommunications, Voice Data, TV Outlets Conduit and Boxes for Coaxial Cable and Electric
Wire feed New Panels
Hook Up Split Units, Air Handlers and RFCs


Untitled-10

Campbell County Justice Center


Copper Wire & Conduit
Light Fixtures & Lamps
Switchgear
Fire Alarm System & Smoke Duct Detectors
Generator

Sound System
Transformer Pad
Electrical To HVAC Units
Secondary Service


ORNL X-10 Site (Various Projects)


Gaseous Waste Reconfiguration-NRM
8 Month Project
Installation of New 250 KW Generator
Panels and Transformer
Grounding
 
ORNL Biomass-Johnson Controls
10 Month Project
HVAC Controls
 
ORNL Bldg. 4500N Generator-GEM Tech
4 Month Project
Install Conduit and Wiring for Generator Power and Controls
Demo Existing Generator
Grounding


6010 STS Renovations-GEM Tech
7 Month Project
Install New 480V 400AMP Power Supply to the Existing STS High Bay
480V Distribution Panel
(3) 75kVA 120/208 Step Down Transformers and Panel Boards
Duct Smoke Detectors and Associated Controls to HVAC System
Security Upgrades to Badge Readers, Cameras, Motion Detectors
Cable Tray and Supports to Power and Control Cabling from Electrical Panels
Lighting
Fiber Optic Cabling

6001 Cooling Tower-GEM Tech
1 Year Project
New Electrical Equipment and Accessories
 
Melton Valley Steam Plant-Applied Energy (ORNL)
8 Month Project
Installation of Lighting and Outlets
Fire Alarms
Conduit and Wire for Generator
Grounding
Power Panels and Transformers